THOENGSAL, J. (2022) “Model Development of Time and Cost Performance Measurement Methods - Earned Value Management (EVM) With a Combination of Dynamic Uncertainty Analysis (Case Study Road Construction Project in South Sulawesi Province)”, Journal of Scientific Research, Education, and Technology (JSRET), 2(1), pp. 34–41. doi: 10.58526/jsret.v2i1.36.