THOENGSAL, JAMES. 2022. “Model Development of Time and Cost Performance Measurement Methods - Earned Value Management (EVM) With a Combination of Dynamic Uncertainty Analysis (Case Study Road Construction Project in South Sulawesi Province)”. Journal of Scientific Research, Education, and Technology (JSRET) 2 (1):34-41. https://doi.org/10.58526/jsret.v2i1.36.