[1]
THOENGSAL, J. 2022. Model Development of Time and Cost Performance Measurement Methods - Earned Value Management (EVM) With a Combination of Dynamic Uncertainty Analysis (Case Study Road Construction Project in South Sulawesi Province). Journal of Scientific Research, Education, and Technology (JSRET). 2, 1 (Jan. 2022), 34–41. DOI:https://doi.org/10.58526/jsret.v2i1.36.